| Project Description: | ADL: ADDITIONAL LANES - This is an existing road that is to have additional lanes and a bridge overpass over the IC Railroad. This may include patching, leveling, resurfacing, bridge, shoulder work, traffic control installation, intersection improvements, drainage improvements, utility relocations and right of way and/or drainage easement acquisition. |
| Project Length: | 3.2 miles. |
| Project Estimate: | $12,000,000.00 |
| Project Status: | An ALDOT Project - Design 30% Complete . |
| Consultant Engineer: | AL. Dept. of Transportation |