Mobile County
Commission 2004 TRANSPORTATION
PAY-AS-YOU-GO PROGRAM DISTRICT THREE PROJECTS
Project # / Road
Name |
Begin Project |
End Project |
Length (MI)* |
Type of Work |
Estimate |
| Click Project Number for
Details |
| MCR-2004-301 |
|
|
|
|
|
| CLUBHOUSE ROAD |
ALBA CLUB RD |
SCENIC DR |
1.0 |
R |
|
| DARWOOD DRIVE |
HALLS MILL RD |
ATOLL DR |
0.7 |
R |
|
| GILL ROAD |
CLUBHOUSE RD |
RIVERSIDE DR |
1.5 |
R |
|
| RIVERSIDE DRIVE |
GILL RD |
CLUBHOUSE RD (WEST END) |
0.6 |
R |
|
| TODD ACRES DRIVE |
RANGELINE RD |
END OF PAVEMENT |
0.3 |
R |
|
| TODD ACRES DRIVE |
HIGGINS RD |
END OF PAVEMENT |
0.5 |
R |
|
| |
TOTAL LENGTH (MILES): |
4.6 |
TOTAL ESTIMATED COST: |
317,000.00 |
| MCR-2004-302 |
|
|
|
|
|
| BRAVA COSTA STREET |
CONDE AVE |
END OF PAVEMENT |
0.3 |
R |
|
| D OLIVE AVENUE |
FORNEY JOHNSTON DR |
BUCHANAN DR |
0.2 |
R |
|
| FORNEY JOHNSTON DRIVE |
BIENVILLE BLVD |
END OF PAVEMENT |
0.4 |
R |
|
| FORT CONDE STREET |
BIENVILLE BLVD |
CONDE AVE |
0.1 |
R |
|
| |
TOTAL LENGTH (MILES): |
1.0 |
TOTAL ESTIMATED COST: |
150,000.00 |
| MCR-2004-303 |
|
|
|
|
|
| NORTH CHILDRESS AVENUE |
HEMLEY ST |
END OF PAVEMENT |
0.1 |
R |
|
| SCHAMBEAU AVENUE |
HEMLEY ST |
END OF PAVEMENT |
0.2 |
R |
|
| SOUTH CHILDRESS AVENUE |
HEMLEY ST |
E RABBY ST |
0.2 |
R |
|
| UNIVERSITY ROAD |
HWY 188 |
END OF PAVEMENT |
0.3 |
R |
|
| W RABBY STREET |
SHELL BELT RD W |
THIRD AVE |
0.2 |
R |
|
| |
TOTAL LENGTH (MILES): |
1.0 |
TOTAL ESTIMATED COST: |
140,000.00 |
| MCR-2004-304 |
|
|
|
|
|
| AIRPORT STREET |
ZEIGLER BLVD |
END OF MAINTENANCE |
0.2 |
GDBP |
|
| MARTY DRIVE |
ZEPHYR DR |
SCHILLINGER RD S |
0.2 |
GDBP |
|
| ROSEMONT CIRCLE |
THREE NOTCH RD |
END OF MAINTENANCE |
0.1 |
GDBP |
|
| WEST VILLA DRIVE |
THREE NOTCH RD |
END OF MAINTENANCE |
0.3 |
GDBP |
|
| |
TOTAL LENGTH (MILES): |
0.8 |
TOTAL ESTIMATED COST: |
540,000.00 |
| MCR-2004-305 |
|
|
|
|
|
| BEGEMAN ROAD |
END OF PAVEMENT |
END OF MAINTENANCE |
0.2 |
GDBP |
|
| ELNINA COURT |
ELNINA DR |
END OF MAINTENANCE |
0.1 |
GDBP |
|
| ELNINA DRIVE |
ELIZA JORDAN RD S |
END OF MAINTENANCE |
0.6 |
GDBP |
|
| GARRIS DRIVE |
REPOLL RD |
END OF MAINTENANCE |
0.3 |
GDBP |
|
| |
TOTAL LENGTH (MILES): |
1.2 |
TOTAL ESTIMATED COST: |
860,000.00 |
| MCR-2004-306 |
|
|
|
|
|
| CAT DEAKLE ROAD |
END OF PAVEMENT |
END OF MAINTENANCE |
1.0 |
GDBP |
|
| SMITH-YOUNG ROAD |
NEWMAN RD |
END OF MAINTENANCE |
0.9 |
GDBP |
|
| |
TOTAL LENGTH (MILES): |
1.9 |
TOTAL ESTIMATED COST: |
1,446,000.00 |
| MCR-2004-307 |
|
|
|
|
|
| GRAND BAY WILMER ROAD S |
END OF PAVEMENT |
NEWMAN RD |
1.4 |
GDBP |
|
| |
TOTAL LENGTH (MILES): |
1.4 |
TOTAL ESTIMATED COST: |
1,300,000.00 |
| MCR-2004-308 |
|
|
|
|
|
| TODD ACRES DRIVE |
JACKSON LN |
KOOIMAN RD |
0.9 |
GDBP |
|
| TODD BOULEVARD |
RANGELINE RD SERV RD |
END OF MAINTENANCE |
0.2 |
GDBP |
|
| |
TOTAL LENGTH (MILES): |
1.1 |
TOTAL ESTIMATED COST: |
960,000.00 |
| MCR-2004-309 |
|
|
|
|
|
| ELMO AVENUE |
SMITH ST |
END OF MAINTENANCE |
0.3 |
GDBP |
|
| HUNTER STREET |
SMITH ST |
END OF MAINTENANCE |
0.1 |
GDBP |
|
| L & N CIRCLE |
SMITH ST |
END OF MAINTENANCE |
0.3 |
GDBP |
|
| MAGNOLIA ROAD |
OLD PASCAGOULA RD |
END OF MAINTENANCE |
0.4 |
GDBP |
|
| ORIENTAL AVENUE |
KIM AVE |
KIM AVE |
0.3 |
GDBP |
|
| SHORT STREET |
HUNTER ST |
KING ST |
0.1 |
GDBP |
|
| |
TOTAL LENGTH (MILES): |
1.5 |
TOTAL ESTIMATED COST: |
1,090,000.00 |
| MCR-2004-310 |
|
|
|
|
|
| JIM BUSBY ROAD |
DAUPHIN ISLAND PKY |
JIM BUSBY RD N |
0.2 |
GDBP |
|
| JIM BUSBY ROAD N |
JIM BUSBY RD |
END OF MAINTENANCE |
0.2 |
GDBP |
|
| JIM BUSBY ROAD S |
JIM BUSBY RD |
END OF MAINTENANCE |
0.4 |
GDBP |
|
| LAKE ROAD S |
HAMMOCK RD |
MIDDLE RD |
0.4 |
GDBP |
|
| TIMBERLANE DRIVE |
BAYOU RD |
END OF MAINTENANCE |
0.2 |
GDBP |
|
| WOODCREST DRIVE |
BAYOU RD |
END OF MAINTENANCE |
0.1 |
GDBP |
|
| |
TOTAL LENGTH (MILES): |
1.5 |
TOTAL ESTIMATED COST: |
1,000,000.00 |
| MCR-2004-311 |
|
|
|
|
|
| DEAKLE LOOP E |
DEAKLE LOOP N |
HWY 188 |
0.2 |
GDBP |
|
| DEAKLE LOOP N |
HWY 188 |
DEAKLE LOOP E |
0.1 |
GDBP |
|
| KILLDEER DR |
WHIP'O WILL LN |
MEADOW LN N |
0.1 |
GDBP |
|
| RAINBOW DR E |
TWO MILE RD |
E.O.M. |
0.2 |
GDBP |
|
| RAINBOW DRIVE W |
TWO MILE RD |
SPUR DR |
0.4 |
GDBP |
|
| SPUR DRIVE |
RAINBOW DR W |
END OF MAINTENANCE |
0.1 |
GDBP |
|
| WHIP O WILL LANE |
IRVINGTON BAYOU LA BATRE HWY |
END OF MAINTENANCE |
0.3 |
GDBP |
|
| WOODLAND TERRACE DRIVE E |
WOODLAND TERRACE DR S |
WOODLAND TERRACE DR N |
0.1 |
GDBP |
|
| WOODLAND TERRACE DRIVE N |
IRVINGTON BAYOU LA BATRE HWY |
WOODLAND TERRACE DR E |
0.2 |
GDBP |
|
| WOODLAND TERRACE DRIVE S |
IRVINGTON BAYOU LA BATRE HWY |
WOODLAND TERRACE DR E |
0.2 |
GDBP |
|
| |
TOTAL LENGTH (MILES): |
1.9 |
TOTAL ESTIMATED COST: |
1,450,000.00 |
| MCR-2004-312 |
|
|
|
|
|
| DIFFEE ROAD |
RAMSEY RD EXT |
SIMS RD |
0.5 |
GDBP |
|
| DOUGLAS ROAD |
LADNER RD |
DIFFEE RD |
0.3 |
GDBP |
|
| DOUGLAS ROAD |
DIFFEE RD |
END OF PAVEMENT |
0.2 |
R |
|
| DOUGLAS ROAD |
HWY 188 |
LADNER RD |
0.2 |
R |
|
| DOUGLAS ROAD |
END OF PAVEMENT |
END OF MAINTENANCE |
0.3 |
GDBP |
|
| HUGH FORT RD |
END OF PAVEMENT |
2500 FT WEST |
0.5 |
GDBP |
|
| SIMS ROAD |
HWY 188 |
DIFFEE RD |
0.5 |
GDBP |
|
| |
TOTAL LENGTH (MILES): |
2.5 |
TOTAL ESTIMATED COST: |
1,940,000.00 |
| MCR-2004-313 |
|
|
|
|
|
| BOE ROAD EXTENSION |
RAMSEY RD |
2800 FT EAST OF RAMSEY RD |
0.5 |
GDBP |
|
| SMITH ROAD |
GRAND BAY WILMER RD S |
END OF MAINTENANCE |
0.5 |
GDBP |
|
| |
TOTAL LENGTH (MILES): |
1.0 |
TOTAL ESTIMATED COST: |
790,000.00 |
| MCR-2004-314 |
|
|
|
|
|
| HURRICANE BOULEVARD |
END OF PAVEMENT |
3460 WEST OF END OF PAVEMENT |
0.7 |
GDBP |
|
| |
TOTAL LENGTH (MILES): |
0.7 |
TOTAL ESTIMATED COST: |
607,000.00 |
| MCR-2004-315 |
|
|
|
|
|
| BOULET DRIVE |
RIVERVIEW DR |
MARGUERITE DR |
0.3 |
GDBP |
|
| MARGUERITE DRIVE |
BOULET DR |
RIVERVIEW DR |
0.3 |
GDBP |
|
| OLD CEDAR POINT ROAD |
DAUPHIN ISLAND PKWY |
RIVERVIEW DR |
0.4 |
GDBP |
|
| RAYNELL AVENUE |
OLD CEDAR POINT RD |
DAUPHIN ISLAND PKWY |
0.1 |
GDBP |
|
| RIVERVIEW DRIVE |
OLD CEDAR POINT RD |
BOULET DR |
0.4 |
GDBP |
|
| |
TOTAL LENGTH (MILES): |
1.5 |
TOTAL ESTIMATED COST: |
1,170,000.00 |
| MCR-2004-316 |
|
|
|
|
|
| DAVID DRIVE |
SMITH RD |
GEORGE CIR |
0.1 |
GDBP |
|
| GEORGE CIRCLE |
DAVID DR |
END OF MAINTENANCE |
0.1 |
GDBP |
|
| ROCK ROAD |
3850 FT EAST OF HEMLEY RD |
HEMLEY RD |
0.7 |
GDBP |
|
| SMITH ROAD |
BELLINGRATH RD |
END OF MAINTENANCE |
0.4 |
GDBP |
|
| |
TOTAL LENGTH (MILES): |
1.3 |
TOTAL ESTIMATED COST: |
880,000.00 |
| MCR-2004-317 |
|
|
|
|
|
| HI FIELDS ROAD |
GRAND BAY WILMER RD S |
DAWES RD |
0.8 |
GDBP |
|
| |
TOTAL LENGTH (MILES): |
0.8 |
TOTAL ESTIMATED COST: |
620,000.00 |
| MCR-2004-318 |
|
|
|
|
|
| DEES ROAD |
ROUSH RD |
BOE RD |
0.5 |
GDBP |
|
| LOUIS TILLMAN ROAD |
U. S. HWY 90 |
3840 NORTH OF HWY 90 |
0.7 |
GDBP |
|
| |
TOTAL LENGTH (MILES): |
1.2 |
TOTAL ESTIMATED COST: |
990,000.00 |
| |
|
|
|
|
|
| PROJECT TOTALS |
LENGTH (MILES): |
26.9 |
ESTIMATED COST: |
16,250,000 |
MCR-2004-300 Projects - These are projects
that will be constructed within the boundaries of County Commission District
Three and will be funded with $16,250,000 Mobile County 2004 Transportation
Pay-As-You-Go Funds. Project MCR-2004-301 includes the resurfacing of many
streets in the City of Mobile. The Administration of the design and
construction of this project will be performed by the City of Mobile's
Engineering Department. The project will be funded by the City of Mobile with
reimbursement by the 2004 Transportation Pay-As-You-Go Funds on a road by road
basis with a maximum reimbursement of $317,000.
| TYPE OF WORK DEFINITIONS |
| ADL: |
ADDITIONAL LANES
- This may include clearing, grubbing, grade, drain, base, pave, patching,
leveling, milling, resurfacing, shoulder work, traffic control installation,
intersection improvements, drainage improvements, utility relocations, and
right-of-way, and/or drainage easement acquisitions, and any other work
necessary for the completion of the project. |
| W&R: |
WIDENING AND
RESURFACING - This may include widening of existing pavement, patching,
leveling, milling, resurfacing, shoulder work, paving of a portion of the
shoulder, traffic control installation, intersection improvements, utility
relocation, and right-of-way and/or drainage easement acquisitions, and any
other work necessary for the completion of the project. |
| R: |
RESURFACE - This
may include patching, leveling, milling, resurfacing of the existing width of
paved road, minor drainage improvements, traffic control installation, utility
relocations, intersection improvements, and right-of-way and/or drainage
acquisitions, and any other work necessary for the completion of the
project. |
| GDBP: |
GRADE, DRAIN,
BASE & PAVE - This may include clearing, grubbing, grade, drain, base,
pave, guardrail, intersection improvements, pavement markings, utility
relocations, and right-of-way and/or drainage easement acquisitions, and any
other work necessary for the completion of the project. |
| BR: |
BRIDGE - This may
include clearing, grubbing, removal of old bridge, grade, drain, base, pave,
new bridge, pavement marking, utility relocation, and right-of-way, and any
other work necessary for the completion of the project. |
| WSO: |
WEARING SURFACE
ONLY - This may include the asphalt material and the labor and equipment to
install the asphalt wearing surface only. |
BACK TO TOP OF
PAGE
BACK TO TOP OF
PAGE |