2006 TRANSPORTATION PAY-AS-YOU-GO PROGRAM INTRODUCTION The MOBILE COUNTY COMMISSION directed the Mobile County Engineering Department to prepare this Engineering Report for the 2006 Transportation Pay-As-You-Go-Program. PROPOSED APPROPRIATION OF FUNDS
All Mobile County 2006 Transportation Pay-As-You-Go-Program funding itemized in this report is based on the passage of the 2006 Transportation Pay-As-You-Go-Program referendum to be voted on by the voters of Mobile County on November 7, 2006. PROGRAM SUMMARY The Program Summary sheets indicate the Project Number, Road Name(s), Begin Project, End Project, Length (rounded to the nearest 0.1 mile), Type of Work and total cost estimated for the design and construction of each project, unless funds are being used as noted to match previous funding for a project. The estimated cost shown for each project includes the construction, professional engineering design, construction quality assurance, preliminary and construction geotechnical reports for materials to be used in each project, right-of-way acquisition, utility relocation, and administration for the Program. 2006 TRANSPORTATION PROJECTS The 2006 Transportation Projects were selected by the Commission for their benefit to the entire County regardless of the County Commission District in which they are located. DESCRIPTION AND FUNDING FOR EACH PROJECT Project MCR-2006-001 (Airport Blvd./Schillinger Rd. Signal System Improvements) Includes the professional engineering services for the signal-timing and corridor study of all intersections on Airport Boulevard from Alverson Road to the Airport Entrance Road and all intersections on Schillinger Road from Tanner Williams Road to Grelot Road. It will also include the installation of a new signal system recommended and designed from this data. This project will be funded by 2006 Transportation Pay-As-You-Go Funds. Project MCR-2006-002 (Airport Boulevard) Includes the resurfacing of Airport Boulevard from Cody Road to Flave Pierce Road. This project will be funded by 2006 Transportation Pay-As-You-Go Funds. Project MCR-2006-003 (Celeste Road) Includes the resurfacing of Celeste Road from Salco Road to the Citronelle City Limits. This project will be funded by 2006 Transportation Pay-As-You-Go Funds. Project MCR-2006-004 (Wilmer Road) Includes the widening and resurfacing of Wilmer Road from Tanner Williams Road to U.S. 98. This project will be funded by 2006 Transportation Pay-As-You-Go Funds. Project MCR-2006-005 (Bellingrath Road) Includes the resurfacing of Bellingrath Road from U.S. 90 to AL 188. This project will be funded by 2006 Transportation Pay-As-You-Go Funds. Project MCR-2006-006 (Chunchula Georgetown Road) Includes the widening resurfacing of Chunchula Georgetown Road from Lott Road to U.S. 45. This project will be funded by 2006 Transportation Pay-As-You-Go Funds. Project MCR-2006-007 (Snow Road) Includes the resurfacing of Snow Road from Tanner Williams Road to Howells Ferry Road with some profile grade improvements in areas determined during the design. This project will be funded with 2006 Transportation Pay-As-You-Go Funds. Project MCR-2006-008 (McDonald Padgett Switch Connector Road) Includes the construction of a four lane divided road from U.S. 90 to Half Mile Road with a new bridge over U.S. 90 and CSX Railroad. This project will be funded with Federal Funds and County Match provided from 2000, 2004, and 2006 Transportation Pay-As-You-Go Funds. Project MCR-2006-009 (McFarland Road and Dawes Lane North) Includes the widening and resurfacing of McFarland Road from Cottage Hill Road to Dawes Lane North and Dawes Lane North from McFarland Road to Dawes Road. This project will be funded with 2006 Transportation Pay-As-You-Go Funds. Project MCR-2006-010 (Cody Road) Includes the widening of Cody Road from Cottage Hill Road to Pine Run Road to three lanes. This program will provide additional funds to match the funds provided in the 2004 Transportation Pay-As-You-Go Program for project MCR-2004-08.
|
||||||||||||||||||||